For Better Performance Please Use Chrome or Firefox Web Browser

Joint economic lot sizing problem in a two-echelon production system with finite production rate and lead time

Malekian, Y., Mirmohammadi, S. H., (2015). Joint economic lot sizing problem in a two-echelon production  system with finite production rate and lead time. International Journal of Optimization in Civil Engineering, 5(3), 375-389.
   

Journal Papers
Month/Season: 
January
Year: 
2015

تحت نظارت وف ایرانی